Work specification form for the construction of Foot-path Suspension bridge over Barak river at Inem junction.
Title | Description | Start Date | End Date | File |
---|---|---|---|---|
Work specification form for the construction of Foot-path Suspension bridge over Barak river at Inem junction. | Link to download the work specification form for the construction of Foot-path Suspension bridge – 100 m span over Barak river at Inem Junction, Tamenglong. [Notice No. DC(Tml)12/HADP/2018 Pt-I] |
17/10/2019 | 31/10/2019 | View (206 KB) |