Close

Work specification form for the construction of Foot-path Suspension bridge over Barak river at Inem junction.

Work specification form for the construction of Foot-path Suspension bridge over Barak river at Inem junction.
Title Description Start Date End Date File
Work specification form for the construction of Foot-path Suspension bridge over Barak river at Inem junction.

Link to download the work specification form for the construction of Foot-path Suspension bridge – 100 m span over Barak river at Inem Junction, Tamenglong. [Notice No. DC(Tml)12/HADP/2018 Pt-I]

17/10/2019 31/10/2019 View (206 KB)