Close

Work specification form for the construction of Foot-path Suspension Bridge over Barak river at Longjon Junction.

Work specification form for the construction of Foot-path Suspension Bridge over Barak river at Longjon Junction.
Title Description Start Date End Date File
Work specification form for the construction of Foot-path Suspension Bridge over Barak river at Longjon Junction.

Link to download the work specification form for the construction of Foot-path Suspension Bridge – 100 m span over Barak river at Longjon Junction, Tamenglong. [Notice No. DC(Tml)12/HADP/2018 Pt-I]

17/10/2019 31/10/2019 View (207 KB)