Work Specification form for the construction of Foot-path Suspension Bridge over Jiri river at Phoklong Junction.
Title | Description | Start Date | End Date | File |
---|---|---|---|---|
Work Specification form for the construction of Foot-path Suspension Bridge over Jiri river at Phoklong Junction. | Link to download the work specification form for the construction of Foot-path Suspension bridge – 80 m span over Jiri river at Phoklong Junction, Tamenglong. [Notice No. DC(Tml)12/HADP/2018 Pt-I] |
17/10/2019 | 31/10/2019 | View (205 KB) |