Work specification form for the construction of Foot-path Suspension Bridge over Jiri River between Pumram and Tatephai.
Title | Description | Start Date | End Date | File |
---|---|---|---|---|
Work specification form for the construction of Foot-path Suspension Bridge over Jiri River between Pumram and Tatephai. | Link to download the work specification form for the construction of Foot-path Suspension Bridge – 100 m span over Jiri river between Pumram and Tatephai, Tamenglong. [Notice No. DC(Tml)12/HADP/2018 Pt-I] |
17/10/2019 | 31/10/2019 | View (207 KB) |