• Site Map
  • Accessibility Links
  • English
Close

Work specification form for the construction of Foot-path Suspension Bridge over Makru river between Namtiram and Tousem.

Work specification form for the construction of Foot-path Suspension Bridge over Makru river between Namtiram and Tousem.
Title Description Start Date End Date File
Work specification form for the construction of Foot-path Suspension Bridge over Makru river between Namtiram and Tousem.

Link to download the work specification form for the construction of Foot-path Suspension Bridge – 100 m span over Makru river between Namtiram and Tousem, Tamenglong. [Notice No. DC(Tml)12/HADP/2018 Pt-I]

17/10/2019 31/10/2019 View (206 KB)