Work specification form for the construction of Foot-path Suspension Bridge over tributary river of Barak river at Illeng Junction
Title | Description | Start Date | End Date | File |
---|---|---|---|---|
Work specification form for the construction of Foot-path Suspension Bridge over tributary river of Barak river at Illeng Junction | Link to download the work specification form for the construction of Foot-path Suspension Bridge – 100 m span over tributary river of Barak river at Illeng Junction, Tamenglong. [Notice No. DC(Tml)12/HADP/2018 Pt-I] |
17/10/2019 | 31/10/2019 | View (207 KB) |